A structure on AltaLink’s 113L Transmission Line is deteriorating and needs to be
urgently replaced. The proposed project is adjacent to AltaLink’s Ghost Substation
near the Ghost Dam berm.
AltaLink is proposing to:
- remove one structure
- add two new structures